Main Menu
In early 2008, The 4014 Studio will be fully operational, for the exclusive use of ourselves and our friends.

This is the latest picture of the Studio, taken in August. As you can see, it has new walls, the hole in the floor has been repaired and a new cupboard is now being installed. Electrics are being wired in. What you can't see is that the interior walls and floors have been fitted with soundproof insulation matt, the ceiling has plasterboard and their are new windows!
PICTURES